December -
Aerial view
-
December -
View of tailrace with generation
-
December -
View of the fishing pier walking path in the recreation area
-
December -
View of the Unit 1 distributor during trial run
-
November -
View of the powerhouse upstream (photo courtesy of MWH)
-
November -
View of the downstream bulkhead slots
-
November -
Placing riprap on downstream slope (photo courtesy of MWH)
-
November -
View of the recreation area sidewalks (photo courtesy of MWH)
-
October -
View of the Unit 2 runner blades (photo courtesy of MWH)
-
October -
Performing a non-load run test to check for noise in Unit 1
-
October -
View of the upstream riprap placement
-
October -
Applying the sealant on the riverside half of the powerhouse roof deck
-
September -
View of the powerhouse roof looking upstream (photo courtesy of MWH)
-
September -
View of the Recreation Area restrooms (photo courtesy of MWH)
-
September -
Dredging the downstream channel (photo courtesy MWH)
-
September -
Checking Unit 1 runner blade clearance (photo courtesy of MWH)
-
August -
Removing existing sheet piling upstream (photo courtesy of MWH)
-
August -
Status of the recreation area facilities
-
August -
View of elevation 582' gas insulated switchgear
-
August -
Barge placed in the tailrace for downstream excavation
-
July -
View of the recreation area (photo courtesy of MWH)
-
July -
Cytec outfall pipe relocation (photo courtesy of MWH)
-
July -
Removing downstream berm material that can be accessed from land
-
July -
Removal of the remaining downstream coffer cells
-
June -
Removing upstream cutoff wall (photo courtesy of MWH)
-
June -
View of the unit substation elevation 582’
-
June -
Removing tie breaker during switching procedure
-
June -
View of the upstream coffer cell removal
-
May -
Aerial view
-
May -
View of the upstream cell removal
-
May -
View of the log grabber
-
May -
Removing cell sheet piling
-
April -
Pulling sheets from Cell 8
-
April -
Removing cell fill from the coffer cell
-
April -
Status of controlled fill of the intake
-
April -
Downstream excavation of rock anchors
-
March -
Removal of rock on the downstream end
-
March -
Installing permanent emergency gate hatch covers
-
March -
Upstream powerhouse view showing progress of trash rack installation
-
March -
Prepping Unit 2 bulb nose
-
February -
Unit 2 bulb nose with dust cover in place
-
February -
View of the 582 elevation
-
February -
Riprap placement on landside slope
-
February -
Second stage concrete work around trashrack rail
-
January -
Excavation activities with snow falling
-
January -
Removing upstream berm
-
January -
View of the powerhouse crane and trolley
-
January -
Status of the fishing pier