Home
Services
Generation
Newsroom
Sustainability
About
AMP 50 Years
Investors
Consumers
Members
Economic Development
Amplifier
Log in
Contact Us
Subscribe
Sitemap
Careers
Media
Terms of Use
Privacy
Log in
Investors
Consumers
Members
Economic Development
Amplifier
Services
AMI Program
Aggregation Consulting Services
AMP Awards Program
Annual Conference
Economic Development
Financial
Hometown Connections
Key Accounts
Legislative, Regulatory & Legal
AMP Power Supply
Community Outreach
Publications
Scholarships Program
Technical Services
AMP Lineworkers Rodeo
Generation
Hydroelectric Power
Fossil Fuels
Solar Power
Landfill Gas
Wind Power
Joint Ventures
Newsroom
Newsroom Archive
AMP Currents
Multimedia Gallery
Sustainability
Principles
Programs
Clean Energy
Environmental Stewardship
About
History
OMEA
Leadership
Board of Trustees
Municipal Electric Partner Program
Awards & Recognition
Annual Reports
Member List
Financial Reports
Membership Map
AMP Transmission
Member Spotlight
Public Power Week
Wall of Fame
Anthem-Transparency in Coverage
People Moving Public Power Forward
Home
/
Newsroom
/
Multimedia Gallery
/
Multimedia Gallery Display
Smithland 2016
Images
Videos
December -
View of the Unit 1 turbine
December -
Site glass for Unit 2 governor oil HPU pressure tank
December -
Planting balance of trees in the recreation area
December -
Access stairs and catwalks installed over Unit 2 discharge ring
November -
Aerial view
November -
Transmission line protective relay testing
November -
View of the recreation area
November -
Installation of permanent platforms in Unit 1
October -
Paving the powerhouse parking area
October -
Installing Unit 1 servomotor
October -
Installing Unit 1 excitation cable
October -
Installing Unit 1 upper discharge ring
September -
Aerial view
September -
Pre-commissioning and function test of Oil Purification System (OPS)
September -
Unit 1 access hatch piping and electrical
September -
Paving Smithland Dam Road
August -
Unit 1 discharge ring preparation
August -
Setting trash rack lifting device into position
August -
Field testing fire suppression pumps
August -
Continued set up of station service switchgear
July -
Aerial view
July -
Pulling the Unit 3 bulb nose into position
July -
Pipefitters preparing pressure test of gate servomotor piping
July -
Smithland Dam road berm work
June -
Unit 3 cover bracket installation
June -
Control room station installation
June -
Lowering the Unit 2 generator cover plate for installation
June -
Geo-grid placement on the tailrace channel slope
May -
Aerial view
May -
Placing riprap in the tailrace
May -
Megger testing of 480V station service switchgear
May -
Final preparation for Unit 3 stator installation
April -
Pipefitters installing support brackets on servomotor oil piping at Unit 1
April -
Lowering Unit 2 stator for placement
April -
Unit 2 rotor installation
April -
Geo grid and riprap placement in the approach channel
March -
Aerial view
March -
Unit 3 runner blade installation
March -
Installing grating on powerhouse roof
March -
Moving Unit 1 rotor into position
February -
Installing the gas insulated switchgear equipment
February -
Installing and testing the emergency generator storage tank
January -
Cable tray and cable installation throughout the powerhouse
January -
Transporting Unit 1 lower discharge ring to the powerhouse
January -
Overtopping of the powerhouse