December -
Setting Unit 1 distributor
-
December -
Rock anchor drilling for concrete wedge wall
-
December -
Trash rake rail alignment
-
December -
Draft tube view of Unit 3
-
November -
Unit 1 prep for shaft installation
-
November -
Lowering Unit 2 distributor into the powerhouse
-
November -
Cable tray coordination
-
November -
Unit 3 bulb nose on tilting device
-
October -
Transmission line work at Structure 2
-
October -
Unit 2 inner gate barrel installed
-
October -
Unit 2 combined bearing support
-
October -
Aerial view
-
September -
Hardfill production landside closure structure
-
September -
Trash rack rail installation
-
September -
Riverside closure topping out
-
September -
Riverside access building
-
August -
Unit 2 bulb turbine housing and draft tube liner
-
August -
Concrete placement of the riverside closure structure
-
August -
Rebar installation at intake roof decks
-
August -
Bulb nose interior framing pre-assembly
-
July -
Bulb nose tilted for interior pre-assembly
-
July -
Riverside watertight door
-
July -
Trolley house install
-
July -
Unit 1 shore tower install for access hatch
-
June -
First crane girder being lifted into place
-
June -
Unit 2 second stage concrete forming
-
June -
Riverside crane beam
-
June -
Aerial view
-
May -
Powerhouse crane trolley rail welding operation
-
May -
Unit 1 shaft being delivered to pre-assembly area (intake slab)
-
May -
Thermite welding of crane rails
-
May -
Bulb turbine housing 2nd stage concrete formwork
-
April -
Unit 1 bulb nose cone assembly
-
April -
Preparing Unit 2 bulb turbine housing second stage concrete
-
April -
Arrival of the powerhouse overhead crane
-
April -
Intake bays and landside closure structure sheet pile cutoff wall
-
March -
Falsework and formwork removed from draft tube liner
-
March -
Unit 1 BTH stay cone realignment (photo courtesy of MWH)
-
March -
Hardfill aggregate hilltop facility
-
March -
Aerial view
-
February -
Landside closure structure excavation for installation of anchors
-
February -
Installing temporary excavation support system for riverside closure structure
-
February -
Offloading of powerhouse bridge crane - second girder section (photo courtesy of MWH)
-
February -
Removing draft tube falsework and formwork
-
January -
Unit 3 draft tube falsework and formwork removal
-
January -
Unit 2 stay cone alignment (photo courtesy of MWH)
-
January -
Unit 1 stay cone alignment (photo courtesy of MWH)
-
January -
View of the intake area