• Home
  • Services
  • Generation
  • Newsroom
  • Sustainability
  • About
  • Investors
  • Consumers
  • Members
  • Economic Development
Log in
  • Contact Us
  • Subscribe
  • Sitemap
  • Careers
  • Media
  • Terms of Use
Log in
  • Investors
  • Consumers
  • Members
  • Economic Development
American Municipal Power
  • Services
    • AMP Power Supply

    • Business Development

    • Safety Programs

    • Scholarship Programs

    • Aggregation

    • Community Outreach

    • Technical Services

    • Hometown Connections

    • Legislative, Regulatory & Legal

    • Publications

    • Financial

    • Annual Conference

    • AMP Lineworkers Rodeo

    • AMI Program

  • Generation
    • Hydroelectric Power

    • Fossil Fuels

    • Solar Power

    • Landfill Gas

    • Wind Power

    • Joint Ventures

  • Newsroom
    • Newsroom Archive

    • AMP Currents

    • Multimedia Gallery

  • Sustainability
    • Principles

    • Programs

    • Clean Energy

    • Carbon Offsets/ Reforestation Program

  • About
    • History

    • OMEA

    • Leadership

    • AMPO Inc

    • Board of Trustees

    • Municipal Electric Partner Program

    • Awards & Recognition

    • Annual Reports

    • Member List

    • Financial Reports

    • Membership Map

    • AMP Transmission

    • Member Spotlight

    • Links of Interest

  • Home/
  • Newsroom/
  • Multimedia Gallery/
  • Multimedia Gallery Display
Cannelton 2015
  • Images
  • Videos
  • C_12-2015-4
    December -
    View of the tailrace channel during Unit 3 trial run (photo courtesy of MWH)
  • C_12-2015-3
    December -
    Removing the temporary roof covers over the Unit 1 turbine gallery hatch
  • C_12-2015-2
    December -
    Pipefitters welding the new oil supply head pipe supports on the Unit 2 generator access hatch cover
  • C_12-2015-1
    December -
    Painting the powerhouse roof with the polyurethane waterproof coating
  • C_11-2015-4
    November -
    View of the log grabber and blockhead slots
  • C_11-2015-3
    November -
    Removing guide bearing shell half for Unit 3
  • C_11-2015-2
    November -
    Cleaning off the Unit 3 bulkhead gates while removing it from the intake
  • C_11-2015-1
    November -
    Installing fall protection monorail
  • C_10-2015-1
    October -
    Inspecting the Unit 3 water passage before closing the discharge ring
  • C_10-2015-4
    October -
    Lifting the access hatch cover for removal
  • C_10-2015-3
    October -
    View of the powerhouse roof deck (intake)
  • C_10-2015-2
    October -
    Demobilizing Tent 1 in Spoil Area 4
  • C_9-2015-4
    September -
    Installing water tight electrical fitting on the powerhouse crane
  • C_9-2015-3
    September -
    Grouting the recreational area riprap walkway
  • C_9-2015-2
    September -
    Performing check outs for Unit 1 bearing oil system (photo courtesy of MWH)
  • C_9-2015-1
    September -
    Pipefitter modifying the Unit 3 oil head piping
  • C_8-2015-4
    August -
    Concrete finishing for the fishing pier walkway
  • C_8-2015-3
    August -
    Air lancing log grabber rails in preparation for grout
  • C_8-2015-2
    August -
    Performing IO checks for the emergency gate
  • C_8-2015-1
    August -
    Commissioning team performing a walkdown of the Unit 2 governor system
  • C_7-2015-4
    July -
    Fishing pier walkway being prepped for concrete placement
  • C_7-2015-3
    July -
    Electricians testing the gantry crane used for unwatering pump removal
  • C_7-2015-2
    July -
    Installing the permanent seal for the Unit 3 transformer roof hatch
  • C_7-2015-1
    July -
    Installing the permanent security fence
  • C_6-2015-4
    June -
    Pipe fitters installing Unit 3 cooling water screens
  • C_6-2015-3b
    June -
    Millwrights installing Unit 3 servomotor
  • C_6-2015-2
    June -
    Carpenters beginning to install fishing pier walkway forms
  • C_6-2015-1
    June -
    Performing load test for the log grabber
  • C_5-2015-4
    May -
    Preparation to move Unit 3 servomotors to the powerhouse
  • C_5-2015-3
    May -
    Millwrights in the Unit 3 bulb turbine housing installing shaft seals
  • C_5-2015-2
    May -
    View of the Unit 2 baffle plate installation
  • C_5-2015-1
    May -
    View of the installed jib crane
  • C_4-2015-4
    April -
    Setting the Unit 2 generator access tube
  • C_4-2015-3
    April -
    Chemical cleaning and pipe flushing equipment on the landside closure structure
  • C_4-2015-2
    April -
    Voltage transformer checks for Unit 1 Cabinet 17 (photo courtesy of MWH)
  • C_4-2015-1
    April -
    Installing the Unit 3 non-segregated bus above the generator access hatch (photo courtesy of MWH)
  • C_3-2015-4
    March -
    Ohio River starting to recede below the powerhouse roof
  • C_3-2015-3
    March -
    Powerhouse roof overtopped with 5.5 feet of river water
  • C_3-2015-2
    March -
    Ohio River starting to overtop the powerhouse roof (photo courtesy of MWH)
  • C_3-2015-1
    March -
    Protecting the distributor equipment in preparation of the river overtopping the powerhouse (photo courtesy of MWH)
  • C_2-2015-4
    February -
    View of the Unit 1 completed shaft guards
  • C_2-2015-3
    February -
    Boilermakers grinding the Unit 3 lower pier baffles
  • C_2-2015-2
    February -
    Painting the Unit 3 bulb nose and cone joint 1
  • C_2-2015-1
    February -
    Installing the gallery walkway
  • C_1-2015-3
    January -
    Installing the gallery walkways in Unit 1
  • C_1-2015-4
    January -
    View of the recreation area's picnic shelter
  • C_1-2015-2
    January -
    Installing light poles on the north side of the substation (photo courtesy of MWH)
  • C_1-2015-1
    January -
    Erecting scaffolding on top of a bulb nose (photo courtesy of MWH)