December -
Receiving girders for the powerhouse crane
-
December -
Preparing to relocate the pre-assembled Unit 1 rotor
-
December -
Receiving the Unit 3 bulb nose cone segments
-
December -
Lifting the Unit 1 bulb nose to be installed onto the bulb nose cone
-
November -
Aerial view
-
November -
Unit 2 horizontal bracing installed between the stay cone and draft tube
-
November -
Setting Unit 2 rotor on air skids for moving into storage
-
November -
Setting formwork for the mechanical-electrical south walls
-
October -
Sand Island dredging progress
-
October -
Draft tube suspended slab formwork and rebar with adjacent mechanical piping
-
October -
Moving Unit 1 shaft on air-float pneumatic skids
-
October -
MWH observing the excavation for the landside closure structure
-
September -
Installing the upper pier onto the Unit 3 bulb turbine housing
-
September -
Concrete formwork for the draft tube suspended slabs
-
September -
Unit 3 draft tube suspended slab formwork and truss bracing
-
September -
Setting the bulb turbine housing on the lower pier in Unit 3
-
August -
View of the tailrace and draft tube liner
-
August -
Unit 1 bulb turbine housing welding of upper and lower piers (photo courtesy of MWH)
-
August -
Installing temporary partition for climate controlled rotor assembly (photo courtesy of MWH)
-
August -
Unit 1 upper pier of bulb turbine housing set in place
-
July -
Installation of the Unit 1 lower pier and bulb turbine housing
-
July -
Unit 1 draft tube wall form removal
-
July -
Landside sheet pile cut-off wall extension
-
July -
Aerial view
-
June -
Preassembly of the bulb turbine housing (photo courtesy of MWH)
-
June -
Completed concrete placement of Unit 1 DTL 2nd stage concrete
-
June -
Tailrace view of the powerhouse
-
June -
Final preparations for Unit 3 DTL second stage concrete lift 5 (photo courtesy of MWH)
-
May -
Installation of anchor bars at the hardfill test placement
-
May -
Preparing for concrete placement
-
May -
Truss bracing installation between riverside draft tube walls
-
May -
Aerial view
-
April -
Hardfill aggregate material
-
April -
The concrete crew placing second stage concrete underneath draft tube liner Unit 1
-
April -
Construction of the hardfill batch plant is nearing completion
-
April -
Concrete pump truck boon extending to Unit 1 draft tube liner
-
March -
Setting Oil Water Separator (OWS-2) into the pit at Unit 2
-
March -
Setting draft tube wall formwork for the tailrace
-
March -
Preparing to place forms at the riverside interior draft tube walls 1 and 2
-
March -
Placing bulb turbine housing in storage area
-
February -
View of the tailrace, rebar and formwork
-
February -
Draft tube slab 13 rebar installation (photo courtesy of MWH)
-
February -
Trash rack box-out detail at intake slab 15
-
February -
Rebar installation at draft tube slab 18
-
January -
Rebar for 256.5 ext. riverside liner stay cone wall 2
-
January -
Draft tube liner Unit 3 Section 6 being set in place
-
January -
Installing Unit 2 draft tube liner section
-
January -
Aerial view