December -
Snow-covered site view
-
December -
First draft tube liner section being set in place
-
December -
Draft tube liner legs set to receive liner sections
-
December -
MWH - Unloading main power transformers
-
November -
View of the site from the tower crane
-
November -
Backfill for Unit 3 liner slab
-
November -
Nitrogen used for cooling at the concrete batch plant
-
November -
Cofferdam overview - placing concrete (west-facing view)
-
October -
Preparing for placement of the mud slab
-
October -
View of the intake mud slab
-
October -
Preassembly of the draft tube liners
-
October -
Embedded oil piping in prefabrication
-
September -
Hydro seeding the slopes
-
September -
Moon at dusk and tower crane 2
-
September -
Aerial view looking into the site
-
September -
Welding piping system prior to concrete embedment
-
August -
Night view of the batch plant
-
August -
Installing security fencing around OFE storage area
-
August -
Slope repair work due to erosion
-
August -
Pouring concrete for the pit slab
-
July -
Setting forms for the 226 pit slabs
-
July -
Placing rebar for the 226 pit slabs
-
July -
Draft tube welding work
-
July -
Aggregate stockpiles and ramps to feed the concrete batch plant
-
June -
View of the batch plant erection
-
June -
Mass excavation for the powerhouse foundation completed
-
June -
Continued erection of building for the temporary storage facilities
-
June -
Aerial view
-
May -
Stone column installation
-
May -
Draft tube liner arrives on site
-
May -
Assembly of the concrete batch plant
-
May -
Site view (upstream)
-
April -
The batch plant is in assembly stage
-
April -
Stone column installation
-
April -
Hatch covers are unloaded on site
-
April -
Setting culverts for a land bridge to the island
-
March -
Aerial view
-
March -
Compaction grouting nears completion
-
March -
Bench preparation for stone column installation
-
March -
Placement of the base slab for the owner-furnished fuel tank
-
February -
Island clearing for future tailrace excavation work
-
February -
The last sheet pile for the cut off wall is driven
-
February -
Compaction grouting continues
-
February -
Six drill rigs work together in a concentrated area
-
January -
Smithland Dam disappears in the fog
-
January -
Sheet piles for powerhouse cut off wall 55%
-
January -
A continuous flight auger drilling for compaction grouting
-
January -
Widening the excavation at elevation 260 for compaction grouting under the powerhouse