December -
Status of the Unit 1 turbine shaft
-
December -
Turbine component installation
-
December -
Powerhouse deck guardrail install
-
December -
Turbine equipment Unit 1 overview
-
November -
Aerial view
-
November -
Unit 3 baffle installation
-
November -
View of the switchgear floor
-
November -
Flushing Unit 2 governor servomotor piping
-
October -
Generator access hatch milling
-
October -
Prepping Unit 3 generator access shaft for install (photo courtesy of MWH)
-
October -
Emergency gate hydraulic power unit (HPU) system
-
October -
Setting Unit 2 generator access shaft baffle plates
-
September -
Inspection of the Voith equipment
-
September -
View of the Unit 1 turbine access shaft
-
September -
AMP IT staff installing equipment
-
September -
Pipe preassembly for the generator access hatch
-
August -
Aerial view
-
August -
Fan diffuser install on Unit 3
-
August -
Unit 2 bulb nose rounding modified
-
August -
Surface preparation and reinforcement of the landside closure structure downstream ramp
-
July -
Long reach hoe operation
-
July -
Electrical gear on turbine equipment floor
-
July -
Riprap placement on landside tailrace bank
-
July -
Log grabber commissioning
-
June -
Unit 1 stator O-ring installation
-
June -
Tailrace excavation with long reach stick
-
June -
Unit 1 preparation for bulb nose fit up
-
June -
Controlled fill progress of the lower pool
-
May -
Aerial view
-
May -
Start of the watering up process
-
May -
Dry testing the trash rake
-
May -
Riprap in Zone 5 and placement of geogrid
-
April -
Stator and rotor final alignment
-
April -
High voltage cable prep training
-
April -
Stator lifted and ready for install
-
April -
Setting Unit 2 rotor onto the shaft
-
March -
Trash rake assembly
-
March -
Transmission line activity
-
March -
Unit 1 bulb nose conduit installation
-
March -
Entrance building view from closure structure
-
February -
Runner blade rough set on Unit 2
-
February -
Jib crane beam install
-
February -
Lowering Unit 3 shaft for installation
-
February -
Aerial view
-
January -
Unit 3 inner gate barrel
-
January -
Unit 1 emergency gate installation
-
January -
Downstream slope construction
-
January -
Runner hub mobilized to powerhouse roof